After weeks and weeks of rain, the sun shone today – bliss! As Nick got on with the daily task of pumping out the moat, Joel arrived to start building the chaufferie, which will house the water heater and the pipes and stuff that will run the heating system. He set Nick and Kieran to work, opening up an old, blocked up window upstairs, while Seb and David started cutting holes in another wall for the French doors and window onto the balcony. Once cut, they put up the shuttering and poured the concrete lintels.
I finished the first little wall of tiling last night, so I laid out the tiles for the next section this evening, arranging and rearranging them until I was happy that I’ve got a “random” pattern. It seems such a small job in comparison with the rest of the work going on right now, but I like the result so far.
Today’s time lapse video