The last few weeks of rain have, if nothing else, served to convince us that the garden has serious drainage issues; so Nick and Kieran, having finished their “homework”, have been working on that while Joel’s away. It’s been a lovely few days, so the moat around the terrace has dried out at last and the lads have dug out a drainage channel, that goes from the moat, round part of the front of the house, then across the garden towards the well. The plan is to drain the excess water into the well and hopefully, use it to water the garden in summer.
I’ve missed most of the sunshine, through teaching and tiling. But the second part of the arrière cuisine tiling is now finished and ready to grout. Part 3 next week, with a bit of luck 🙂